{"id":10721,"date":"2019-08-22T12:31:05","date_gmt":"2019-08-22T16:31:05","guid":{"rendered":"http:\/\/videonewsservice.net\/?p=10721"},"modified":"2019-08-22T12:31:05","modified_gmt":"2019-08-22T16:31:05","slug":"batavia-full-cost-of-an-unanticipated-expense-for-bridge-over-the-tonawanda-creek-avoided","status":"publish","type":"post","link":"https:\/\/videonewsservice.net\/index.php\/2019\/08\/22\/batavia-full-cost-of-an-unanticipated-expense-for-bridge-over-the-tonawanda-creek-avoided\/","title":{"rendered":"BATAVIA\/Full cost of an unanticipated expense for bridge over the Tonawanda Creek avoided"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img decoding=\"async\" width=\"1280\" height=\"622\" data-attachment-id=\"10722\" data-permalink=\"https:\/\/videonewsservice.net\/index.php\/2019\/08\/22\/batavia-full-cost-of-an-unanticipated-expense-for-bridge-over-the-tonawanda-creek-avoided\/bridge\/\" data-orig-file=\"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?fit=1280%2C622&amp;ssl=1\" data-orig-size=\"1280,622\" data-comments-opened=\"1\" data-image-title=\"bridge\" data-image-description=\"\" data-image-caption=\"\" data-large-file=\"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?fit=900%2C438&amp;ssl=1\" loading=\"lazy\" src=\"https:\/\/i1.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?fit=900%2C438\" alt=\"\" class=\"wp-image-10722\" srcset=\"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?w=1280&amp;ssl=1 1280w, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?resize=300%2C146&amp;ssl=1 300w, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?resize=768%2C373&amp;ssl=1 768w, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?resize=1024%2C498&amp;ssl=1 1024w, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?resize=150%2C73&amp;ssl=1 150w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The Batavia Town Board voted 4-0 to pay an additional $37,626 to Keeler Construction for unanticipated work that came up during the construction of the pedestrian\/bike bridge over the Tonawanda Creek which is part of the Ellicott Trail Project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The resolution states that during construction the bridge required driving steel piles for the bridge abutment. It then became apparent that driving the piles would have required temporary relocation of the overhead electric lines at an estimated cost of about $90,000 according to National Grid. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">To avoid this cost, the design and construction team at Keeler construction revised the design to allow the use of drilled king piles to support the bridge at a net cost of $37,626.85. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">After being reviewed by the Town Engineer and Assistant Town Engineer, a change order was awarded and Keeler Construction&#8217;s contract went from $1,019,110 to $1,056.736.85 for the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Ellicott Trail is expected to open by the end of October.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Batavia Town Board voted 4-0 to pay an additional $37,626 to Keeler Construction for unanticipated work that came up during the construction of the pedestrian\/bike bridge over the Tonawanda Creek which is part of the Ellicott Trail Project. The resolution states that during construction the bridge required driving steel \u2026<\/p>\n<p class=\"continue-reading-button\"> <a class=\"continue-reading-link\" href=\"https:\/\/videonewsservice.net\/index.php\/2019\/08\/22\/batavia-full-cost-of-an-unanticipated-expense-for-bridge-over-the-tonawanda-creek-avoided\/\">Continue reading<i class=\"crycon-right-dir\"><\/i><\/a><\/p>\n","protected":false},"author":1,"featured_media":10722,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","om_disable_all_campaigns":false,"advanced_seo_description":"","jetpack_seo_html_title":"","jetpack_seo_noindex":false,"jetpack_seo_schema_type":"","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[8,1],"tags":[1771],"class_list":["post-10721","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-batavia","category-uncategorized","tag-pedestrian-brdge"],"jetpack_publicize_connections":[],"jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p8eTP4-2MV","jetpack-related-posts":[{"id":10570,"url":"https:\/\/videonewsservice.net\/index.php\/2019\/08\/13\/genesee-county-batavia-bridge-over-tonawanda-creek-installed-for-ellicott-trail-bike-pedestrian-path\/","url_meta":{"origin":10721,"position":0},"title":"GENESEE COUNTY\/Batavia\/Bridge over Tonawanda creek installed for Ellicott Trail bike\/pedestrian path","author":"aka","date":"August 13, 2019","format":false,"excerpt":"Keeler Construction has been on location on Walnut street for most of the day installing a pre-engineered bridge over the Tonawanda Creek to complete the Ellicott Trail Project. https:\/\/youtu.be\/VOALRGbNT3Y Video of bridge moving across the creek The 15 ton, 56,000 pound bridge was being held by a barge in the\u2026","rel":"","context":"In &quot;Batavia&quot;","block_context":{"text":"Batavia","link":"https:\/\/videonewsservice.net\/index.php\/category\/gennesse-county\/batavia\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge-1.jpg?fit=1200%2C583&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge-1.jpg?fit=1200%2C583&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge-1.jpg?fit=1200%2C583&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge-1.jpg?fit=1200%2C583&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge-1.jpg?fit=1200%2C583&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":40764,"url":"https:\/\/videonewsservice.net\/index.php\/2023\/03\/14\/batavia-south-lyon-street-bridge-replacement-work-to-resume-on-friday\/","url_meta":{"origin":10721,"position":1},"title":"BATAVIA\/South Lyon Street bridge replacement work to resume on Friday","author":"aka","date":"March 14, 2023","format":false,"excerpt":"(Provided graphic) Press release Batavia, NY \u2013 Work for the South Lyon Street Bridge over the Tonawanda Creek project will resumeFriday, March 17, 2023, as the work on the bridge had been paused due to seasonal weather conditions. A small portion of South Main Street in Batavia will be closed\u2026","rel":"","context":"In &quot;Batavia&quot;","block_context":{"text":"Batavia","link":"https:\/\/videonewsservice.net\/index.php\/category\/gennesse-county\/batavia\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/03\/S-lyon-bridge-render.png?fit=883%2C489&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/03\/S-lyon-bridge-render.png?fit=883%2C489&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/03\/S-lyon-bridge-render.png?fit=883%2C489&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/03\/S-lyon-bridge-render.png?fit=883%2C489&ssl=1&resize=700%2C400 2x"},"classes":[]},{"id":44125,"url":"https:\/\/videonewsservice.net\/index.php\/2023\/06\/30\/batavia-ribbon-cutting-officially-opens-the-s-lyon-street-bridge-to-traffic\/","url_meta":{"origin":10721,"position":2},"title":"BATAVIA\/Ribbon cutting officially opens the S. Lyon Street bridge to traffic","author":"aka","date":"June 30, 2023","format":false,"excerpt":"https:\/\/youtu.be\/NNK0Yogj8NE Video story-ribbon cutting and interview with Tim Hens\/Genesee County Highway Superintendent The S. Lyon Street bridge officially opened to traffic on June 30, 2023, with an official ribbon cutting at S. Lyon Street and S. Main Street, the same spot of a ribbon cutting in a 1957 photo provided\u2026","rel":"","context":"In &quot;Batavia&quot;","block_context":{"text":"Batavia","link":"https:\/\/videonewsservice.net\/index.php\/category\/gennesse-county\/batavia\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/06\/S.-Lyon-st-bridge-still.jpg?fit=1200%2C675&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/06\/S.-Lyon-st-bridge-still.jpg?fit=1200%2C675&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/06\/S.-Lyon-st-bridge-still.jpg?fit=1200%2C675&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/06\/S.-Lyon-st-bridge-still.jpg?fit=1200%2C675&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2023\/06\/S.-Lyon-st-bridge-still.jpg?fit=1200%2C675&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":45364,"url":"https:\/\/videonewsservice.net\/index.php\/2023\/08\/04\/genesee-county-fargo-road-bridge-replacement-project-to-begin-in-batavia\/","url_meta":{"origin":10721,"position":3},"title":"GENESEE COUNTY\/Fargo Road Bridge Replacement Project to begin in Batavia","author":"aka","date":"August 4, 2023","format":false,"excerpt":"Press release Batavia, NY - The Fargo Road Bridge Replacement Project is set to commence on August 14th, 2023,bringing essential improvements to the bridge located over Black Creek near Route 63 and Little CanadaExtension. The current 11-foot-wide jack arch bridge will be replaced with a modern 28-foot precast concrete archbridge\u2026","rel":"","context":"In &quot;Genesee County&quot;","block_context":{"text":"Genesee County","link":"https:\/\/videonewsservice.net\/index.php\/category\/genesee-county\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]},{"id":36206,"url":"https:\/\/videonewsservice.net\/index.php\/2022\/09\/21\/genesee-county-south-lyon-street-bridge-replacement-work-to-begin-on-monday\/","url_meta":{"origin":10721,"position":4},"title":"GENESEE COUNTY\/South Lyon street bridge replacement work to begin on Monday","author":"aka","date":"September 21, 2022","format":false,"excerpt":"Press release Batavia, NY \u2013 Work for the replacement of the South Lyon Street Bridge over the Tonawanda Creek willbegin Monday, September 26th. The bridge was closed in September of 2021 due to structuraldeficiencies that warranted a replacement. The existing bridge is a modernized version of a \u201cBaileyBridge\u201d that was\u2026","rel":"","context":"In &quot;Batavia&quot;","block_context":{"text":"Batavia","link":"https:\/\/videonewsservice.net\/index.php\/category\/gennesse-county\/batavia\/"},"img":{"alt_text":"","src":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2022\/09\/Bridge-Rendering.jpg?fit=1100%2C613&ssl=1&resize=350%2C200","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2022\/09\/Bridge-Rendering.jpg?fit=1100%2C613&ssl=1&resize=350%2C200 1x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2022\/09\/Bridge-Rendering.jpg?fit=1100%2C613&ssl=1&resize=525%2C300 1.5x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2022\/09\/Bridge-Rendering.jpg?fit=1100%2C613&ssl=1&resize=700%2C400 2x, https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2022\/09\/Bridge-Rendering.jpg?fit=1100%2C613&ssl=1&resize=1050%2C600 3x"},"classes":[]},{"id":52301,"url":"https:\/\/videonewsservice.net\/index.php\/2024\/04\/11\/genesee-county-highway-department-announces-multiple-projects-starting-in-april\/","url_meta":{"origin":10721,"position":5},"title":"Genesee County Highway Department announces multiple projects starting in April","author":"aka","date":"April 11, 2024","format":false,"excerpt":"Press release Genesee County, NY\u2014 over the upcoming months, the Genesee County Highway Department willundertake multiple projects across the county that will temporarily impact local travel routes. Fargo Road Bridge:A bridge replacement project will begin on April 18th, 2024, in Bethany, to upgrade the current bridge onFargo Road over Black\u2026","rel":"","context":"In &quot;Genesee County&quot;","block_context":{"text":"Genesee County","link":"https:\/\/videonewsservice.net\/index.php\/category\/genesee-county\/"},"img":{"alt_text":"","src":"","width":0,"height":0},"classes":[]}],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/videonewsservice.net\/wp-content\/uploads\/2019\/08\/bridge.jpg?fit=1280%2C622&ssl=1","_links":{"self":[{"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/posts\/10721","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/comments?post=10721"}],"version-history":[{"count":2,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/posts\/10721\/revisions"}],"predecessor-version":[{"id":10724,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/posts\/10721\/revisions\/10724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/media\/10722"}],"wp:attachment":[{"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/media?parent=10721"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/categories?post=10721"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/videonewsservice.net\/index.php\/wp-json\/wp\/v2\/tags?post=10721"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}